Sunday, February 26, 2012

How to handle the crushers down during the process


 The mining industry usually happen to meet the machine down, if the workers failed to check out the crux of the matter and failed to repair immediately, the company will suffer great loss because the machine was blocked.

 However, what lead to the machine down during the process? What the measure worker should take to handle the machine down, the following will explain this for us:

 First: the workers are rushing the hours and keep feeding the machine raw material gave rise to the machine load and shall block the machine. To continue processing the material, workers should clear up the feed. This phenomenon warned us that the well distribute feeding is necessary, thus the machine will protected from downing.

 Second, the jaw crusher drove by the belt conveyor, the inappropriate tightness of the conveyor belt will also lead to the machine down, such over loose will generate no enough power to drive the machine to run, the over tight will lead to the conveyor easy to crack, the efficiency will be highly influenced. So we should keep in mind that we will check the belt carefully before the the machine start on.

Third, the jaw crusher will bear the fierce power during its operation which will lead to the over tight of the inside machine and the efficiency will be further influenced. Such as the jaw crusher will stop working because the shaft axle inside the machine over loose, the correct way is to check whether the spare parts of mining machine becoming less crowded, and we should tighten them to keep the machines function well. 

No comments:

Post a Comment